Construction estimate template

A construction estimate prices the job stage by stage, from site work to finishes, and holds anything the client has not chosen yet as an allowance. The generator below opens on a renovation example: change the quantities to your takeoff, set your prices and download the PDF. In the UK, Australia and Canada the same document is usually called a building quote or quotation.

construction estimate generator

Who it is from and for
Items
  • $3,200.00

  • $8,160.00

  • $7,400.00

  • $5,800.00

  • $6,200.00

  • $4,000.00

  • $1,500.00

  • $1,150.00

Tax, discount, deposit and terms

Free, no account. Your figures stay in this browser.

Want your client to sign and pay a deposit?

Send this estimate as a page they can approve online. You see when they open it and when they sign.

ESTIMATE

Number
EST-0001

From

Your business

Prepared for

Client

DescriptionQtyAmount
Site preparation and demolition1 x $3,200.00$3,200.00
Framing labor (hours)120 x $68.00$8,160.00
Lumber and framing materials1 x $7,400.00$7,400.00
Electrical and plumbing rough-in1 x $5,800.00$5,800.00
Drywall, trim and paint1 x $6,200.00$6,200.00
Allowance: fixtures and finishes chosen by the client1 x $4,000.00$4,000.00
Contingency for conditions found during demolition1 x $1,500.00$1,500.00
Permits, dumpster and disposal1 x $1,150.00$1,150.00
Subtotal
$37,410.00
Total
$37,410.00
Deposit to start (20%)
$7,482.00
Balance on completion
$29,928.00

Terms and notes

Based on the plans and site visit dated above. Allowances are budgets for items you will choose; the final cost follows your selection. Conditions found once walls are opened, and changes you ask for, are priced as change orders and approved in writing before the work is done.

The figures are an example to replace with your own prices. Nothing you type is sent to our servers; the PDF is made in your browser.

How to price a construction estimate

The method behind the example above, step by step.

  1. Price it by stage, from your takeoff

    Site work, structure, rough-ins, finishes. Clients follow a job in the order it is built, and a stage-by-stage estimate lets them see where the money goes before they reach the total.

  2. Turn open choices into allowances

    Cabinets, tile, fixtures and appliances the client has not picked yet go in as allowances with an amount. When they choose, the difference is added or credited, instead of you guessing their taste.

  3. Carry a contingency on renovations

    Older buildings hide things: rot, old wiring, out-of-level floors. Set the contingency from your own past jobs, name it on the estimate, and say that unused contingency is not charged.

  4. Keep overhead and profit consistent

    Either build them into every unit price or show them as one line. Mixing both makes the estimate hard to defend when a client compares it with another one.

  5. State the payment schedule up front

    A deposit, then payments at stages the client can see (framing done, rough-ins inspected, substantial completion). Some US states cap deposits on home improvement work, so check the rule where you build.

What a construction estimate should include

Check the PDF against this list before you send it.

  • The plans or drawings it is based on, with their date or revision
  • The date of your site visit
  • Scope by stage, with what is included in each
  • Each allowance with its amount and what it covers
  • Exclusions, such as landscaping, appliances or furniture
  • Who pulls the permits and who pays for them
  • The payment schedule and what triggers each payment
  • How changes are priced and approved (a written change order)
  • How long the estimate is valid, and the warranty you give

Estimate, quote or quotation?

The same document goes by different names, and carries different tax lines, depending on where you work. The generator lets you rename the tax line and pick USD, EUR, GBP, CAD or AUD.

United States
Usually called an estimate. Sales tax on materials and labor depends on the state, so check whether your work is taxable before adding a tax line.
United Kingdom and Ireland
Usually a quotation or building quote. VAT applies at the standard rate (20% in the UK) unless the work qualifies for a reduced rate.
Australia and New Zealand
Usually a quote. A change to the agreed work is called a variation, and GST (10% in Australia, 15% in New Zealand) is shown on the total.
Canada
Estimate and quote are both used. Show GST, or HST in the provinces that charge it, on its own line.

Construction estimates: common questions

Turn the estimate into a signed job.

Send the same figures as a page your client can approve online. They sign, you take the deposit with your own payment link, and you see when they opened it.

Free plan · No credit card · 14 days of Pro