Free change order template

A change order records extra or removed work on a job that is already agreed: what changes, what it costs, the new contract sum and the days it adds. Fill it in below and download the PDF, or send it as a page your client signs. No account needed.

Change order generator

Project and parties
What changes and why

In plain words: what was found or asked for, and what you will do differently.

Cost of the change
  • $432.00

  • $420.00

  • $408.00

  • -$650.00

Contract, tax and schedule

Free, no account. Your figures stay in this browser.

Want the client to approve it online?

Send this change order as a page they sign before the extra work starts. You see when they open it and when they sign.

CHANGE ORDER

CO-001

From

Your business

For

Client

Project:
Kitchen remodel, 14 Elm Street
Changes:
Proposal accepted on the date in your contract
Reason:
Hidden or unforeseen condition

Water damage was found under the sink wall once the old cabinets were removed. Replace the damaged subfloor and two wall studs before the new cabinets go in. The client asked to drop the under-cabinet lighting at the same time.

DescriptionQtyAmount
Remove and replace damaged subfloor (square feet)24 x $18.00$432.00
Replace two wall studs and sheathing1 x $420.00$420.00
Additional labor (hours)6 x $68.00$408.00
Credit: Under-cabinet lighting removed from scope1 x $650.00-$650.00
Added work
$1,260.00
Credits
-$650.00
This change
+$610.00

Contract sum

Original
$38,500.00
This change
+$610.00
New contract sum
$39,110.00

Schedule: Adds 2 working days to the schedule.

This change order becomes part of the original agreement once both parties sign. Everything else in the agreement stays the same. Work on this change starts after it is signed.

Contractor signature and date

Client signature and date

How to write a change order that gets signed

The six habits that keep a change from turning into a dispute.

  1. Write it before the extra work starts

    A change order agreed after the work is done is a negotiation over money already spent. Stop, write it up, get it signed, then do the work.

  2. Say what changes and why

    What was found or asked for, and what you will do differently. A reason in plain words (hidden damage, a client request, a code requirement) makes the cost easier to accept.

  3. Price it like the original job

    Use the same units and rates as the agreement it changes. A different pricing method on the change invites the question of why.

  4. Credit what comes out

    When the client drops part of the work, show it as a credit on the same change order. The net figure is what they approve, and they see you took the removed work off.

  5. Show the new contract sum

    The original sum, the earlier changes, this change and the new total. Nobody has to add up five documents to know what the job now costs.

  6. Add the days, not only the dollars

    Extra work moves the finish date. State the working days added, so the schedule changes on paper at the same time as the price.

Change order or variation?

The same document has different names depending on where you build. The generator lets you name the tax line and choose USD, EUR, GBP, CAD or AUD.

United States and Canada
Usually called a change order. Construction contracts often require changes to be in writing and signed before the work, so check what yours says.
Australia and New Zealand
Usually called a variation or variation order. Home building contracts commonly require variations in writing, with the price and the time impact.
United Kingdom and Ireland
Called a variation, change order or change instruction depending on the contract. Show VAT on the change if you are registered.

Change orders: common questions

Get the change signed before the work.

Send the change order as a page your client approves on their phone. You see when they open it, and the signed version is kept with the time and the figures they accepted.

Free plan · No credit card · 14 days of Pro