ESTIMATE
- Number
- EST-0001
From
Your business
Prepared for
Client
| Description | Qty | Amount |
|---|---|---|
| Panel upgrade to 200 amp (equipment) | 1 x $1,450.00 | $1,450.00 |
| Labor (hours) | 12 x $115.00 | $1,380.00 |
| New circuits (each) | 4 x $185.00 | $740.00 |
| Outlets and switches (each) | 10 x $65.00 | $650.00 |
| Wire, breakers and materials | 1 x $420.00 | $420.00 |
| Permit and inspection | 1 x $250.00 | $250.00 |
| Utility disconnect and reconnect coordination | 1 x $150.00 | $150.00 |
- Subtotal
- $5,040.00
- Total
- $5,040.00
- Deposit to start (30%)
- $1,512.00
- Balance on completion
- $3,528.00
Terms and notes
Work is done to the electrical code in force where the job is. Existing wiring found to be unsafe once panels or walls are open is shown to you and priced before we continue. Patching and painting of walls is not included unless listed. The utility sets the date for the disconnect, which can move the schedule.